{"schema_version":"GreyResearchGraph 1.0","study_id":"GSX:SRD-005","node_count":18,"edge_count":24,"nodes":[{"id":"GSX:SRD-005:C01","type":"claim","label":"A credible R225 billion programme could establish 34 industrial modules and, in the central case, support about 11,100 direct operating jobs, roughly 10,000 supplier jobs and R108 billion of annual sales.","evidence_status":"modelled","href":"https://greyscienx.com/research/r350-counterfactual/the-r200-billion-factory/claims/C01"},{"id":"GSX:SRD-005:A01","type":"assumption","label":"R225 billion in constant 2026 rand is allocated across the programme. R96 billion, 43 percent, goes directly into production plants. The rest is power, water, logistics, parks, supplier finance, skills, worker housing and a R15 billion contingency.","evidence_status":"modelled","href":"https://greyscienx.com/api/v1/research/the-r200-billion-factory"},{"id":"GSX:SRD-005:A02","type":"assumption","label":"The production core is 34 modules across manganese-battery materials, PGM-hydrogen components, vanadium storage and shared machinery or recycling.","evidence_status":"modelled","href":"https://greyscienx.com/api/v1/research/the-r200-billion-factory"},{"id":"GSX:SRD-005:R01","type":"result","label":"In the central case the programme supports about 11,100 direct operating jobs, roughly 10,000 supplier jobs, R108 billion of annual sales, 700 MW of reliable power demand and 12 million cubic metres of annual industrial water demand.","evidence_status":"modelled","href":"https://greyscienx.com/api/v1/research/the-r200-billion-factory"},{"id":"GSX:SRD-005:C02","type":"claim","label":"More than half of the envelope enables production rather than buying production equipment. Peak construction employment near 40,000 direct jobs is not permanent operating employment.","evidence_status":"modelled","href":"https://greyscienx.com/research/r350-counterfactual/the-r200-billion-factory/claims/C02"},{"id":"GSX:SRD-005:A03","type":"assumption","label":"At 40 percent average use the portfolio creates almost no local value after its fixed burden. Above 70 percent the case becomes materially stronger.","evidence_status":"modelled","href":"https://greyscienx.com/api/v1/research/the-r200-billion-factory"},{"id":"GSX:SRD-005:R02","type":"result","label":"Construction employment peaks near 40,000 direct jobs and is temporary. Only R96 billion of the R225 billion goes directly into production plants.","evidence_status":"modelled","href":"https://greyscienx.com/api/v1/research/the-r200-billion-factory"},{"id":"GSX:SRD-001","type":"study","label":"The R350 Industrialisation Counterfactual","evidence_status":"modelled","href":"https://greyscienx.com/research/r350-counterfactual/the-r350-industrialisation-counterfactual"},{"id":"GSX:SRD-005","type":"study","label":"The R200 Billion Factory","evidence_status":"modelled","href":"https://greyscienx.com/research/r350-counterfactual/the-r200-billion-factory"},{"id":"GSX:SRD-002","type":"study","label":"The Welfare Cost of Not Paying the Grant","evidence_status":"modelled","href":"https://greyscienx.com/research/r350-counterfactual/the-welfare-cost-of-not-paying-the-grant"},{"id":"GSX:SRD-003","type":"study","label":"Consumption Today or Productive Capital Tomorrow?","evidence_status":"modelled","href":"https://greyscienx.com/research/r350-counterfactual/consumption-today-or-productive-capital-tomorrow"},{"id":"GSX:SRD-004","type":"study","label":"The Public-Capital Multiplier","evidence_status":"modelled","href":"https://greyscienx.com/research/r350-counterfactual/the-public-capital-multiplier"},{"id":"GSX:SRD","type":"series","label":"The R350 Counterfactual","evidence_status":null,"href":"https://greyscienx.com/series/r350-counterfactual"},{"id":"GSX:SRD-005:M01","type":"model","label":"Physical allocation of R225 billion","evidence_status":"modelled","href":"https://greyscienx.com/api/v1/research/the-r200-billion-factory"},{"id":"GSX:SRD-005:PDF","type":"source","label":"The R200 Billion Factory","evidence_status":null,"href":"https://greyscienx.com/research/r350-counterfactual/the-r200-billion-factory.pdf"},{"id":"GSX:TOPIC:industrialisation","type":"topic","label":"Industrialisation","evidence_status":null,"href":"https://greyscienx.com/topics/industrialisation"},{"id":"GSX:TOPIC:grants","type":"topic","label":"Social grants","evidence_status":null,"href":"https://greyscienx.com/topics/grants"},{"id":"GSX:TOPIC:south-africa","type":"topic","label":"South Africa","evidence_status":null,"href":"https://greyscienx.com/topics/south-africa"}],"edges":[{"subject_id":"GSX:SRD-005:C01","predicate":"depends_on","object_id":"GSX:SRD-005:A01","note":"Registered dependency."},{"subject_id":"GSX:SRD-005:C01","predicate":"depends_on","object_id":"GSX:SRD-005:A02","note":"Registered dependency."},{"subject_id":"GSX:SRD-005:C01","predicate":"derived_from","object_id":"GSX:SRD-005:R01","note":"Registered result."},{"subject_id":"GSX:SRD-005:C02","predicate":"depends_on","object_id":"GSX:SRD-005:A01","note":"Registered dependency."},{"subject_id":"GSX:SRD-005:C02","predicate":"depends_on","object_id":"GSX:SRD-005:A03","note":"Registered dependency."},{"subject_id":"GSX:SRD-005:C02","predicate":"derived_from","object_id":"GSX:SRD-005:R02","note":"Registered result."},{"subject_id":"GSX:SRD-001","predicate":"related_to","object_id":"GSX:SRD-005","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-002","predicate":"related_to","object_id":"GSX:SRD-005","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-003","predicate":"related_to","object_id":"GSX:SRD-005","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-004","predicate":"related_to","object_id":"GSX:SRD-005","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-005","predicate":"part_of","object_id":"GSX:SRD","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-005","predicate":"has_claim","object_id":"GSX:SRD-005:C01","note":"Registered claim."},{"subject_id":"GSX:SRD-005:C01","predicate":"generated_by","object_id":"GSX:SRD-005:M01","note":"Physical allocation of R225 billion"},{"subject_id":"GSX:SRD-005:C01","predicate":"supported_by","object_id":"GSX:SRD-005:PDF","note":"Source registered on the conditional claim."},{"subject_id":"GSX:SRD-005","predicate":"has_claim","object_id":"GSX:SRD-005:C02","note":"Registered claim."},{"subject_id":"GSX:SRD-005:C02","predicate":"generated_by","object_id":"GSX:SRD-005:M01","note":"Physical allocation of R225 billion"},{"subject_id":"GSX:SRD-005:C02","predicate":"supported_by","object_id":"GSX:SRD-005:PDF","note":"Source registered on the conditional claim."},{"subject_id":"GSX:SRD-005","predicate":"has_topic","object_id":"GSX:TOPIC:industrialisation","note":"Registered topic."},{"subject_id":"GSX:SRD-005","predicate":"has_topic","object_id":"GSX:TOPIC:grants","note":"Registered topic."},{"subject_id":"GSX:SRD-005","predicate":"has_topic","object_id":"GSX:TOPIC:south-africa","note":"Registered topic."},{"subject_id":"GSX:SRD-005","predicate":"related_to","object_id":"GSX:SRD-001","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-005","predicate":"related_to","object_id":"GSX:SRD-002","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-005","predicate":"related_to","object_id":"GSX:SRD-003","note":"The R350 Counterfactual"},{"subject_id":"GSX:SRD-005","predicate":"related_to","object_id":"GSX:SRD-004","note":"The R350 Counterfactual"}]}