{"id":"GSX:IND-001:C01","local_id":"C01","claim":"On the manuscript's illustrative value pool, focused integration retains 66.3 percent, compared with 37.6 percent for the existing footprint and 81.4 percent for a frontier partnership case.","claim_type":"conditional","status":"conditional","evidence_status":"modelled","confidence":null,"depends_on":["GSX:IND-001:A01","GSX:IND-001:A02"],"result":"GSX:IND-001:R01","results":["GSX:IND-001:R01"],"sensitivity":"high","main_limitation":"These are not forecasts of GDP or company revenue. Geology is not industrial power: the manuscript distinguishes reserve shares from mined-production shares.","source_study":"GSX:IND-001","version":"1.0","href":"https://greyscienx.com/research/strategic-industrialisation/the-south-african-critical-minerals-industrial-complex/claims/C01","supported_by":["GSX:IND-001:PDF"],"contradicted_by":[],"qualifies":[],"contradicts":[]}